owner
North Texas Municipal Water District
estimated completion date
completion date
Q2 2027
scope
This project includes the construction of a 4.15-MG ground storage tank with all piping and appurtenances, an above ground meter station. a check valve vault, approximately 925-lf of 36-inch bar-wrapped pipe, a 100-lf of 54" steel casing tunneled below Custer Road and connecting to the new 36-inch NTMWD Plano pipeline. Site improvements include, new concrete paving, turning lanes into the site, perimeter fencing and a precast electrical building housing the electrical and instrumentation improvements.
contract price
$12,900,000.00